Section Home

York College Construction Maintenance Environmental Health and Safety Procedure 2008

Plan health and safety prevention before starting any job that would cause dust and odors, such as installing carpeting, curtains or painting, by increasing ventilation or scheduling the job on weekends or evenings if there are many people that would be affected. Improve the EHS prevention when the need arises

York College-Construction-Maintenance-Environmental-Health-and-Safety-Procedure-2008.pdf